Files
openairinterface5g/doc/E1AP/e1ap_procedures.md
Guido Casati 5a1af1a7db doc: add QoS flows handling and PDU Session Modify documentation
Also, move PDU Session Release diagram to new PDU Session Management section in rrc-dev.md.

Changes:

PDU Session Modify:
- Update PDU session modification sequence diagram
- Add DRB-To-Remove/To-Modify/To-Setup list handling
- Document E1AP Bearer Context Modification flow
- Add RRC reconfiguration trigger after E1AP response

QoS Flows Handling:

- Complete overview with 3GPP standards references (TS 23.501, 37.324, 38.463, 29.281, 38.331)
- Comprehensive Mermaid sequence diagram covering control and data plane

Technical details:
- Multiple QoS flows per DRB supported
- QFI to DRB mapping at RRC and SDAP layer
- F1-U tunnels: 1 per DRB, no QFI marking
- N3 tunnels: 1 per PDU session, with QFI marking

Signed-off-by: Guido Casati <guido.casati@openairinterface.org>
2026-05-04 12:03:28 +02:00

3.3 KiB

E1AP Procedures

[[TOC]]

Introduction

The E1 interface is between the gNB-CU-CP (Central Unit - Control Plane) and gNB-CU-UP (Central Unit - User Plane) nodes. This interface is governed by the E1 Application Protocol (E1AP) outlined in the 3GPP release 16 specifications, specifically in the documents:

  • 3GPP TS 38.463 - E1 Application Protocol (E1AP)
  • 3GPP TS 38.460 - E1 general aspects and principles
  • 3GPP TS 38.461 - E1 interface: layer 1
  • 3GPP TS 38.462 - E1 interface: signaling transport

The E1AP protocol consists of the following sets of functions:

  • E1 Interface Management functions
  • E1 Bearer Context Management functions
  • TEID allocation function

E1 Bearer Context Management function

This function handles the establishment, modification, and release of E1 bearer contexts.

  • E1 Bearer Context Establishment: initiation of E1 bearer context is by gNB-CU-CP and acceptance or rejection is determined by gNB-CU-UP based on admission control criteria (e.g., resource availability).
  • E1 Bearer Context Modification: can be initiated by either gNB-CU-CP or gNB-CU-UP, with the receiving node having the authority to accept or reject the modification.
  • Release of Bearer Context: can be triggered either directly by gNB-CU-CP or following a request from gNB-CU-UP.
  • QoS-Flow to DRB Mapping Configuration: responsible for setting up and modifying the QoS-flow to DRB mapping configuration. gNB-CU-CP decides the flow-to-DRB mapping, generates SDAP and PDCP configurations, and provides them to gNB-CU-UP.

OAI implementation

For the E1AP design in OAI, please refer to the E1 Design document.

E1 re-establishment

The purpose of this procedure is to follow-up the re-establishment of RRC connection over the E1 interface. For all activated DRBs a Bearer Context Modification from CU-CP to CU-UP is necessary, according to clause 9.2.2.4 of 3GPP TS 38.463. If any modification to the bearer context is required, the CU-CP informs the CU-UP with the relevant IEs (e.g. in case of PDCP re-establishment, PDCP Configuration IE clause 9.3.1.38), Current implementation in OAI:

sequenceDiagram
  participant e as UE
  participant d as DU
  participant c as CUCP
  participant u as CUUP

  Note over e,c: RRCReestablishment Procedure
  e->>d: RRCReestablishmentRequest
  Note over d: initial_ul_rrc_message_transfer_f1ap
  d->>+c: Initial UL RRC Message Transfer (CCCH, new C-RNTI)
  Note over c: rrc_gNB_process_initial_ul_rrc_message
  Note over c: rrc_handle_RRCReestablishmentRequests
  c-->>+d: DL RRC Message Transfer
  note right of d: fallback to RRC establishment
  d-->>-e: RRCSetup
  e-->>d: RRCSetupComplete
  Note over c: rrc_gNB_generate_RRCReestablishment
  Note over c: cuup_notify_reestablishment
  Note over c: e1apCUCP_send_BEARER_CONTEXT_MODIFICATION_REQUEST
  c->>u: BEARER CONTEXT MODIFICATION REQUEST
  Note over u: e1apCUUP_handle_BEARER_CONTEXT_MODIFICATION_REQUEST
  Note over u: e1_bearer_context_modif
  Note over u: nr_pdcp_reestablishment
  c->>-d: DL RRC Message Transfer (old gNB DU F1AP UE ID)
  d->>e: RRCReestablishment
  Note over d: Fetch UE Context with old gNB DU F1AP UE ID and update C-RNTI
  e->>d: RRCReestablishmentComplete
  u->>c: BEARER CONTEXT MODIFICATION RESPONSE
  Note over c: e1apCUCP_handle_BEARER_CONTEXT_MODIFICATION_RESPONSE